|
1- Support for operation of electric system on Dalkia site:
§ He will organize Dalkia sites Control System audit.
§ He will prepare report following the audit including improvements for better efficiency and operation optimization.
§ He will optimize Control System in the Dalkia District Heating or Cooling Network.
§ He will optimize Automation for Heating & Cooling Plant or Cogeneration Plant Operation
§ He will organize training for staff on site regarding Automation & Control System
2- Automation and Control System auditing for new Project
Part of the Technical team in charge of Project auditing, he will be in charge of :
§ Auditing automation system following Dalkia standard.
§ Checking installation and verification of equipment quality
§ Advising on the automation, control system audited and proposing improvement for energy savings and better Operation.
§ Costing of the improvement proposed for the budget preparation.
3- Electrical Engineering study:
§ He will review any existing drawing and software taking into account local standards requirements, Dalkia specifications and specific site conditions.
§ He will have to participate in the project planning preparation within the team: preliminary design, sizing equipment, working planning etc.
§ He will assist on working planning and organization program revue.
§ He will assist for equipment commissioning.
§ He will work on Supplier Contract preparation: scope of work, budget, technical specifications of material and equipment, construction standard, expected functionalities, staff qualifications etc.
§ He will implement Dalkia Asia documentation for Automation and Control System equipment. |